Comprehensive & Reliable Logistic Solutions
West Gate Tunnel | 2023
Transported approximately 2,000 precast concrete components for Melbourne’s West Gate Tunnel Project over four years. Custom transport frames, modified trailers and efficient offloading systems enabled the delivery of massive crossheads, bridge beams and matchcast segments for elevated roadways and bridges.
Yaloak Wind Farm | 2018
Supported Yaloak South Wind Farm near Geelong with the transport of components for 14 Senvion turbines. Bringing turbine components from Geelong and tower sections from Whyalla, the transport scope connected two separate supply origins with the Victorian wind farm site.
Yandin Wind Farm | 2026
Delivered components for 51 Vestas turbines from Henderson to Yandin Wind Farm, north of Perth. Covering approximately 220 kilometres each way, the project was coordinated alongside Warradarge, with the combined program achieving deliveries of five complete turbines per week.
Build on Performance and Trust
-
We are very pleased with ARES and the logistics service they have provided at Biala Wind Farm for WTG transport. Their comprehensive solution covers every key aspect including planning, permitting, vessel discharge, and delivery to site, and the daily operation is well managed by highly skilled professionals. Their performance has been recognised by not only the project team but also our subcontractors. The flexibility and efficiency they have demonstrated throughout the Biala project helped us achieve the target under budget. I trust they will continue with excellent performance on future projects and wish for the next opportunity to work with them again.
Andy Wang, TSI Project Manager, Goldwind Australia
-
We are very pleased with ARES and the logistics service they have provided at Biala Wind Farm for WTG transport. Their comprehensive solution covers every key aspect including planning, permitting, vessel discharge, and delivery to site, and the daily operation is well managed by highly skilled professionals. Their performance has been recognised by not only the project team but also our subcontractors. The flexibility and efficiency they have demonstrated throughout the Biala project helped us achieve the target under budget. I trust they will continue with excellent performance on future projects and wish for the next opportunity to work with them again.
ANDY WANG, TSI PROJECT MANAGER, GOLDWIND AUSTRALIA
-
The can-do attitude of Ares was unparalleled in the industry. Importantly, it was Ares’ foresight and innovation which brought these projects to completion. A key feature during execution were the bookend trailers safely utilised at Murra Warra. These trailers were specially designed and developed by Ares and partners to transport the largest tower sections ever seen in the Australian wind industry, being 6m in diameter.
PAUL PHELAN, HEAD OF PROJECTS, SENVION APAC
-
Bollore Logistics worked with Ares for the delivery of the 104 WTG Moorabool Wind Farm in rural Victoria. At all times Bollore found Ares to be technically and operationally innovative, highly competitive – providing genuine value for money, totally reliable and compliant with the highest HSE standards. We look forward to working together with Ares again in the future and we would not hesitate to recommend them for any difficult heavy haulage projects.
MARK NORMAN, PROJECT MANAGER, BOLLORE LOGISTICS
-
Ares were able to meet the compressed schedule requirements of the project while providing exceptional level of service. The components were delivered on time, within budget and free of any damage.
GURPREET CHATHA, PROJECT MANAGER, VESTAS
-
ARES have set the bar high with their ability to be self-efficient with both transport and cranage with exceptionally high HSE and Quality standards. Communication with all stakeholders at both Port and Project site, the management, engineering solutions and ability to be flexible they have demonstrated throughout the project was remarkable. I would highly recommend ARES and looking forward to working with them on future projects.
TOBIE NEL, ANZ PROJECT LOGISTICS MANAGER, GE VERNOVA
-
We are very pleased with ARES and the logistics service they have provided at Biala Wind Farm for WTG transport. Their comprehensive solution covers every key aspect including planning, permitting, vessel discharge, and delivery to site, and the daily operation is well managed by highly skilled professionals. Their performance has been recognised by not only the project team but also our subcontractors. The flexibility and efficiency they have demonstrated throughout the Biala project helped us achieve the target under budget. I trust they will continue with excellent performance on future projects and wish for the next opportunity to work with them again.
Andy Wang, TSI Project Manager, Goldwind Australia
-
51 WTGs were delivered safe and sound to the Yandin Wind Farm in WA by ARES, including the longest blade (73.6m) transported in WA.
Transportation in WA came with many challenges, including the fact that each component needed a permit and each permit could only be applied 28 days prior to transportation. Moreover, the bushfires added further difficulties during mobilisation. On top of that, COVID-19 caused many constraints regarding the rotation of interstate resources.
ARES managed to sail through all of these challenges successfully without complaints. ARES always came up with a solution when there was a problem, that made the job far easier than what it could have been otherwise.
RAJESH DUPURKAR, VESTAS PROJECT MANAGER, YANDIN WIND FARM