M500
The M500 was designed to adapt to the load, not the other way around.
Delivered components for 51 Vestas turbines from Henderson to Yandin Wind Farm, north of Perth. Covering approximately 220 kilometres each way, the project was coordinated alongside Warradarge, with the combined program achieving deliveries of five complete turbines per week.
Delivered 38 GE turbines and a 120-tonne transformer from Port Kembla to Flyers Creek Wind Farm in NSW. The scope combined port logistics, heavy haulage and on-site cranage, managing restricted storage and regional transport routes through to final offloading.
Delivered 51 Vestas turbines from Henderson to Warradarge Wind Farm in Western Australia. Coordinated alongside Yandin, the combined transport program achieved five complete turbine deliveries per week, supported by efficient port handling, detailed scheduling and a strong focus on safety.
Transported components for 104 Goldwind turbines from the Port of Geelong to Moorabool Wind Farm in Victoria. Covering approximately 55 kilometres each way, the delivery program connected port operations with site construction for this major renewable energy development.
Delivered components for 61 Senvion turbines from Portland to Murra Warra Wind Farm in northwestern Victoria. Covering approximately 259 kilometres each way, the transport scope supported the first stage of the development, moving oversized turbine components from port to site.
Transported 31 Goldwind turbines from Port Kembla to Biala Wind Farm in NSW. A custom-designed trailer overcame low bridge clearances, keeping deliveries on the preferred route and helping complete the transport program within 16 weeks and under budget.
Delivered 35 Senvion turbines from Whyalla to Lincoln Gap Wind Farm over 24 weeks. Specialist trailers and supporting tow vehicles enabled crews to navigate confined port infrastructure and haul 140-tonne nacelles up steep access roads to the site.
Transported 39 Senvion turbines from Portland to Crowlands Wind Farm in western Victoria. Careful port coordination and specialised towing equipment helped crews manage shared storage, oversized tower sections and steep site roads with gradients reaching 20%.
Supported Yaloak South Wind Farm near Geelong with the transport of components for 14 Senvion turbines. Bringing turbine components from Geelong and tower sections from Whyalla, the transport scope connected two separate supply origins with the Victorian wind farm site.